{"id":2809,"date":"2025-03-28T01:46:52","date_gmt":"2025-03-28T00:46:52","guid":{"rendered":"https:\/\/biorig.energy\/biorig-will-invest-250-million-euros-to-build-10-biomethane-production-facilities-in-castilla-y-leon\/"},"modified":"2025-04-15T11:52:19","modified_gmt":"2025-04-15T09:52:19","slug":"biorig-will-invest-250-million-euros-to-build-10-biomethane-production-facilities-in-castilla-y-leon","status":"publish","type":"post","link":"https:\/\/biorig.energy\/en\/biorig-will-invest-250-million-euros-to-build-10-biomethane-production-facilities-in-castilla-y-leon\/","title":{"rendered":"Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n."},"content":{"rendered":"\n\n<section class=\"content\">\n  <div class=\"inner\">\n    <div class=\"container \">\n      \n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\"><em>The group of facilities will produce biomethane equivalent to 20% of the annual gas consumption of households in Castilla y Le\u00f3n. <\/em><em>The plants, which will be built in rural areas of the provinces of Le\u00f3n, Zamora, Salamanca, Valladolid, Burgos, and Soria, are expected to be operational by the end of 2025.<\/em><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><em><strong>These infrastructures have a strategic nature for the sustainable rural development of the region, boosting wealth and population retention by creating more than 350 local jobs. The 10 plants will enable the reuse of more than one and a half million tonnes of agricultural and livestock waste, producing a renewable gas that will avoid the annual emission of 300,000 tonnes of CO<sub>\u2082<\/sub> into the atmosphere. <\/strong><\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Organic-based fertilisers will also be produced, and state-of-the-art technology will be incorporated to capture biogenic CO\u2082 and achieve zero discharge in operations.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Biorig<\/em>, the biomethane division of <em>Solarig<\/em>, has announced an investment of 250 million euros for the development, construction and operation of 10 biomethane production facilities in the region of Castilla y Le\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The group of plants will produce an amount of biomethane equivalent to the total annual gas consumption of 20% of households in the autonomous community. The new facilities will be located in rural areas of municipalities in the provinces of Le\u00f3n, Zamora, Salamanca, Valladolid, Burgos and Soria, generating a significant positive impact on the rural and sustainable development of the region. Likewise, this project will create more than 350 jobs and will allow the recovery of more than one and a half million tonnes per year of agricultural and livestock waste, which will prevent the emission of 300,000 tonnes of CO<sub>\u2082 <\/sub>into the atmosphere. The facilities, whose development has already begun, are expected to be operational by the end of 2025. The development project of the first of these facilities was presented last October in San Mill\u00e1n de los Caballeros (Le\u00f3n).    <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cCastilla y Le\u00f3n has the greatest potential for biomethane generation in Spain. These facilities, in addition to being new sources of green energy production, constitute essential infrastructures for the correct management and long-term recovery of waste in the region. Fifteen years ago, we invested in and built the largest solar energy plant in Castilla y Le\u00f3n, in the municipalities of Frechilla de Almaz\u00e1n and Coscurita (Soria), an infrastructure that continues to produce renewable energy steadily to this day. Today we announce the development of 10 plants that represent our commitment to biomethane in this autonomous community,\u201d explained Miguel \u00c1ngel Calleja, President of Solarig. <strong>Miguel \u00c1ngel Calleja<\/strong>, presidente de Solarig.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are already developing the 10 facilities that will all use agricultural and livestock waste, manure, slurry and agricultural residues as their main energy source. They will be 100% sustainable, zero-emission plants, respectful of the rural environment and fully compliant with the most rigorous environmental and sustainable soil fertilisation regulations. Our growth plan in Castilla y Le\u00f3n is a differential factor for its energy development and a driver of growth for strategic sectors such as agriculture and livestock,\u201d , said <strong>Manuel Alonso<\/strong>, General Manager of Biorig.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Zero Discharge Technology<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The 10 facilities will feature state-of-the-art technology to ensure zero discharge: from the capture of biogenic CO<sub>\u2082 <\/sub>to the reuse of rainwater, enabling zero water consumption and guaranteeing zero discharge. In addition, the by-products or digestates (the waste remaining after the energy production process) will be treated to be converted into organic fertilisers. In this way, dependence on chemical fertilisers will be reduced, contributing to more sustainable fertilisation of agricultural soils in the region.  <\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>BIORIG, circular economy and energy sustainability<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Biorig is the biomethane production division of Solarig. It was created with the aim of providing innovative solutions in the field of renewable gases and CO\u2082 capture.  <\/em><em>CO<sub>2<\/sub><\/em><em>. Its activity focuses on the management of organic waste for its transformation into renewable gases and the promotion of project development within the framework of the energy transition and the circular economy.<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Solarig, sustainable energy solutions for society<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Solarig develops the infrastructure needed for the energy transition, and builds, operates, and financially structures large-scale renewable energy projects. It currently manages more than 10 GW of photovoltaic assets and has a portfolio of more than 20 GW in 16 countries. The company promotes global decarbonisation in the regions where it operates through renewable energy and green gas solutions. Headquartered in Madrid, Spain, it has a strong presence in Europe, Central and South America, Japan and Australia. Committed to innovation and sustainability, Solarig has a team of more than 1,000 professionals.    <\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Solarig works towards the energy transition and global decarbonisation and contributes to achieving the highest levels of energy independence in the markets where it operates. Solarig\u2019s purpose is to play a key role in the sustainable progress of society, leading the transition towards cleaner energy sources. The company aspires to generate a positive impact on the environment through its operations and its relationships with public authorities, shareholders, clients, professionals, partners and suppliers.  <\/em><\/p>\n<\/div>\n<\/div>\n\n\n    <\/div>\n  <\/div>\n<\/section>\n\n    <section class=\"carousel\" style=\"background-color:#F1F2F2;\">\n        <div class=\"inner\">\n            <div class=\"carousel--header\">\n                <div class=\"column\">\n                                        <h2 class=\"title\">Other news<\/h2>\n                <\/div>\n                <div class=\"column\">\n                    <div class=\"info\">\n                                                                    <\/div>\n                <\/div>\n            <\/div>\n                        <div class=\"carousel--content carousel--content-main\">\n                <div class=\"carousel--navigation\">\n                    <div class=\"container--navigation\">\n                        <div class=\"swiper-button-prev\"><\/div>\n                        <div class=\"swiper-pagination\"><\/div>\n                        <div class=\"swiper-button-next\"><\/div>\n                        <div class=\"custom-pagination\" data-swiper-pagination=\"carousel-main\">\n                          <span class=\"current-slide\">1<\/span>\/<span class=\"total-slides\">x<\/span>\n                        <\/div>\n                    <\/div>\n                <\/div>\n                <div id=\"carousel-main\" class=\"swiper carousel--main\">\n                    <div class=\"swiper-wrapper\">\n                                                                                    <a href=\"https:\/\/biorig.energy\/biorig-participa-en-el-foro-transicion-energetica-y-economia-circular-de-kreab\/\" class=\"card swiper-slide\">\n                                    <div class=\"card--image\">\n                                        <img decoding=\"async\" src=\"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/03\/Claves-de-la-semana-68.png\" alt=\"Biorig participa en el foro \u00abTransici\u00f3n Energ\u00e9tica y Econom\u00eda Circular\u00bb de KREAB\" \/>\n                                        <div class=\"card--info\">\n                                            <div class=\"tags\">\n                                                <ul>\n                                                                                                                                                                                                                            <li>\n                                                                <span>Actualidad<\/span>\n                                                            <\/li>\n                                                                                                                    <li>\n                                                                <span>Notas de prensa<\/span>\n                                                            <\/li>\n                                                                                                                                                            <\/ul>\n                                            <\/div>\n                                            <h3 class=\"title\">\n                                                Biorig participa en el foro \u00abTransici\u00f3n Energ\u00e9tica y Econom\u00eda Circular\u00bb de KREAB                                            <\/h3>\n                                            <div class=\"content--toshow\">\n                                                <div class=\"excerpt\">\n                                                    <p>\n                                                                                                            <\/p>\n                                                <\/div>\n                                                <div class=\"wp-block-buttons\">\n                                                    <div class=\"wp-block-button secondary\">\n                                                        <span class=\"wp-block-button__link\">Learn more<\/span>\n                                                    <\/div>\n                                                <\/div>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/a>\n                                                            <a href=\"https:\/\/biorig.energy\/biorig-participa-en-la-103a-edicion-de-la-feria-de-maquinaria-agricola-de-valencia-de-don-juan-leon\/\" class=\"card swiper-slide\">\n                                    <div class=\"card--image\">\n                                        <img decoding=\"async\" src=\"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/03\/9faf5ecd-256b-4db5-92cc-758a5a46c184-1.png\" alt=\"Biorig participa en la 103\u00aa edici\u00f3n de la Feria de Maquinaria Agr\u00edcola de Valencia de Don Juan (Le\u00f3n)\" \/>\n                                        <div class=\"card--info\">\n                                            <div class=\"tags\">\n                                                <ul>\n                                                                                                                                                                                                                            <li>\n                                                                <span>Actualidad<\/span>\n                                                            <\/li>\n                                                                                                                    <li>\n                                                                <span>Notas de prensa<\/span>\n                                                            <\/li>\n                                                                                                                                                            <\/ul>\n                                            <\/div>\n                                            <h3 class=\"title\">\n                                                Biorig participa en la 103\u00aa edici\u00f3n de la Feria de Maquinaria Agr\u00edcola de Valencia de Don Juan (Le\u00f3n)                                            <\/h3>\n                                            <div class=\"content--toshow\">\n                                                <div class=\"excerpt\">\n                                                    <p>\n                                                                                                            <\/p>\n                                                <\/div>\n                                                <div class=\"wp-block-buttons\">\n                                                    <div class=\"wp-block-button secondary\">\n                                                        <span class=\"wp-block-button__link\">Learn more<\/span>\n                                                    <\/div>\n                                                <\/div>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/a>\n                                                            <a href=\"https:\/\/biorig.energy\/podcast-futuro-verde-gases-verdes-biometano\/\" class=\"card swiper-slide\">\n                                    <div class=\"card--image\">\n                                        <img decoding=\"async\" src=\"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/04\/close-up-microphone-concert-stage-with-beautiful-lighting-scaled.jpg\" alt=\"Podcast: Futuro verde \u2013 Gases verdes: biometano\" \/>\n                                        <div class=\"card--info\">\n                                            <div class=\"tags\">\n                                                <ul>\n                                                                                                                                                                                                                            <li>\n                                                                <span>Actualidad<\/span>\n                                                            <\/li>\n                                                                                                                    <li>\n                                                                <span>Podcast<\/span>\n                                                            <\/li>\n                                                                                                                                                            <\/ul>\n                                            <\/div>\n                                            <h3 class=\"title\">\n                                                Podcast: Futuro verde \u2013 Gases verdes: biometano                                            <\/h3>\n                                            <div class=\"content--toshow\">\n                                                <div class=\"excerpt\">\n                                                    <p>\n                                                                                                            <\/p>\n                                                <\/div>\n                                                <div class=\"wp-block-buttons\">\n                                                    <div class=\"wp-block-button secondary\">\n                                                        <span class=\"wp-block-button__link\">Learn more<\/span>\n                                                    <\/div>\n                                                <\/div>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/a>\n                                                            <a href=\"https:\/\/biorig.energy\/aun-estamos-a-tiempo\/\" class=\"card swiper-slide\">\n                                    <div class=\"card--image\">\n                                        <img decoding=\"async\" src=\"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/04\/fellaria-1906-1.jpg\" alt=\"A\u00fan estamos a tiempo\u00a0\" \/>\n                                        <div class=\"card--info\">\n                                            <div class=\"tags\">\n                                                <ul>\n                                                                                                                                                                                                                            <li>\n                                                                <span>Actualidad<\/span>\n                                                            <\/li>\n                                                                                                                    <li>\n                                                                <span>Multimedia<\/span>\n                                                            <\/li>\n                                                                                                                                                            <\/ul>\n                                            <\/div>\n                                            <h3 class=\"title\">\n                                                A\u00fan estamos a tiempo\u00a0                                            <\/h3>\n                                            <div class=\"content--toshow\">\n                                                <div class=\"excerpt\">\n                                                    <p>\n                                                                                                            <\/p>\n                                                <\/div>\n                                                <div class=\"wp-block-buttons\">\n                                                    <div class=\"wp-block-button secondary\">\n                                                        <span class=\"wp-block-button__link\">Learn more<\/span>\n                                                    <\/div>\n                                                <\/div>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/a>\n                                                            <a href=\"https:\/\/biorig.energy\/tribuna-cinco-dias-espana-necesita-una-mayor-ambicion-en-biometano-para-acelerar-la-transicion-energetica\/\" class=\"card swiper-slide\">\n                                    <div class=\"card--image\">\n                                        <img decoding=\"async\" src=\"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/04\/Fertilizante-1.jpg\" alt=\"Cinco D\u00edas: Espa\u00f1a necesita una mayor ambici\u00f3n en biometano para acelerar la transici\u00f3n energ\u00e9tica\" \/>\n                                        <div class=\"card--info\">\n                                            <div class=\"tags\">\n                                                <ul>\n                                                                                                                                                                                                                            <li>\n                                                                <span>Actualidad<\/span>\n                                                            <\/li>\n                                                                                                                    <li>\n                                                                <span>Art\u00edculos<\/span>\n                                                            <\/li>\n                                                                                                                                                            <\/ul>\n                                            <\/div>\n                                            <h3 class=\"title\">\n                                                Cinco D\u00edas: Espa\u00f1a necesita una mayor ambici\u00f3n en biometano para acelerar la transici\u00f3n energ\u00e9tica                                            <\/h3>\n                                            <div class=\"content--toshow\">\n                                                <div class=\"excerpt\">\n                                                    <p>\n                                                                                                            <\/p>\n                                                <\/div>\n                                                <div class=\"wp-block-buttons\">\n                                                    <div class=\"wp-block-button secondary\">\n                                                        <span class=\"wp-block-button__link\">Learn more<\/span>\n                                                    <\/div>\n                                                <\/div>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/a>\n                                                            <a href=\"https:\/\/biorig.energy\/el-dia-de-soria-biometano-una-oportunidad-para-el-crecimiento-de-una-economia-mas-verde-y-sostenible\/\" class=\"card swiper-slide\">\n                                    <div class=\"card--image\">\n                                        <img decoding=\"async\" src=\"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/04\/shutterstock_274715528-scaled-e1744109830161.jpg\" alt=\"El D\u00eda de Soria: Biometano, una oportunidad para el crecimiento de una econom\u00eda m\u00e1s verde y sostenible\" \/>\n                                        <div class=\"card--info\">\n                                            <div class=\"tags\">\n                                                <ul>\n                                                                                                                                                                                                                            <li>\n                                                                <span>Actualidad<\/span>\n                                                            <\/li>\n                                                                                                                    <li>\n                                                                <span>Art\u00edculos<\/span>\n                                                            <\/li>\n                                                                                                                                                            <\/ul>\n                                            <\/div>\n                                            <h3 class=\"title\">\n                                                El D\u00eda de Soria: Biometano, una oportunidad para el crecimiento de una econom\u00eda m\u00e1s verde y sostenible                                            <\/h3>\n                                            <div class=\"content--toshow\">\n                                                <div class=\"excerpt\">\n                                                    <p>\n                                                                                                            <\/p>\n                                                <\/div>\n                                                <div class=\"wp-block-buttons\">\n                                                    <div class=\"wp-block-button secondary\">\n                                                        <span class=\"wp-block-button__link\">Learn more<\/span>\n                                                    <\/div>\n                                                <\/div>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/a>\n                                                                        <\/div>\n                <\/div>\n            <\/div>\n                    <\/div>\n    <\/section>\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":506,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[30,33],"tags":[],"class_list":["post-2809","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-releases"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n. - Biorig<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n. - Biorig\" \/>\n<meta property=\"og:url\" content=\"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/\" \/>\n<meta property=\"og:site_name\" content=\"Biorig\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-28T00:46:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-15T09:52:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/03\/Diseno-sin-titulo-2023-08-01T124601.771-1536x1024-1-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"jesus\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"jesus\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/\"},\"author\":{\"name\":\"jesus\",\"@id\":\"https:\\\/\\\/biorig.energy\\\/#\\\/schema\\\/person\\\/9e98c4e4ef4a7e6de3862e92a08214cc\"},\"headline\":\"Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n.\",\"datePublished\":\"2025-03-28T00:46:52+00:00\",\"dateModified\":\"2025-04-15T09:52:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/\"},\"wordCount\":824,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/biorig.energy\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Diseno-sin-titulo-2023-08-01T124601.771-1536x1024-1.png\",\"articleSection\":[\"News\",\"Press releases\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/\",\"url\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/\",\"name\":\"Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n. - Biorig\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/biorig.energy\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/biorig.energy\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Diseno-sin-titulo-2023-08-01T124601.771-1536x1024-1.png\",\"datePublished\":\"2025-03-28T00:46:52+00:00\",\"dateModified\":\"2025-04-15T09:52:19+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/biorig.energy\\\/#\\\/schema\\\/person\\\/9e98c4e4ef4a7e6de3862e92a08214cc\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/#primaryimage\",\"url\":\"https:\\\/\\\/biorig.energy\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Diseno-sin-titulo-2023-08-01T124601.771-1536x1024-1.png\",\"contentUrl\":\"https:\\\/\\\/biorig.energy\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Diseno-sin-titulo-2023-08-01T124601.771-1536x1024-1.png\",\"width\":1536,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/biorig.energy\\\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/biorig.energy\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/biorig.energy\\\/#website\",\"url\":\"https:\\\/\\\/biorig.energy\\\/\",\"name\":\"Biorig\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/biorig.energy\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/biorig.energy\\\/#\\\/schema\\\/person\\\/9e98c4e4ef4a7e6de3862e92a08214cc\",\"name\":\"jesus\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5caf1f24679fbfd198c93f845a85f7cd1c181cd3d6cc6f62e71af6f275f56bdc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5caf1f24679fbfd198c93f845a85f7cd1c181cd3d6cc6f62e71af6f275f56bdc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5caf1f24679fbfd198c93f845a85f7cd1c181cd3d6cc6f62e71af6f275f56bdc?s=96&d=mm&r=g\",\"caption\":\"jesus\"},\"sameAs\":[\"https:\\\/\\\/biorig.energy\"],\"url\":\"https:\\\/\\\/biorig.energy\\\/en\\\/author\\\/jesus\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n. - Biorig","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/","og_locale":"en_US","og_type":"article","og_title":"Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n. - Biorig","og_url":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/","og_site_name":"Biorig","article_published_time":"2025-03-28T00:46:52+00:00","article_modified_time":"2025-04-15T09:52:19+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/03\/Diseno-sin-titulo-2023-08-01T124601.771-1536x1024-1-1024x683.png","type":"image\/png"}],"author":"jesus","twitter_card":"summary_large_image","twitter_misc":{"Written by":"jesus","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/#article","isPartOf":{"@id":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/"},"author":{"name":"jesus","@id":"https:\/\/biorig.energy\/#\/schema\/person\/9e98c4e4ef4a7e6de3862e92a08214cc"},"headline":"Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n.","datePublished":"2025-03-28T00:46:52+00:00","dateModified":"2025-04-15T09:52:19+00:00","mainEntityOfPage":{"@id":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/"},"wordCount":824,"commentCount":0,"image":{"@id":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/#primaryimage"},"thumbnailUrl":"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/03\/Diseno-sin-titulo-2023-08-01T124601.771-1536x1024-1.png","articleSection":["News","Press releases"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/","url":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/","name":"Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n. - Biorig","isPartOf":{"@id":"https:\/\/biorig.energy\/#website"},"primaryImageOfPage":{"@id":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/#primaryimage"},"image":{"@id":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/#primaryimage"},"thumbnailUrl":"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/03\/Diseno-sin-titulo-2023-08-01T124601.771-1536x1024-1.png","datePublished":"2025-03-28T00:46:52+00:00","dateModified":"2025-04-15T09:52:19+00:00","author":{"@id":"https:\/\/biorig.energy\/#\/schema\/person\/9e98c4e4ef4a7e6de3862e92a08214cc"},"breadcrumb":{"@id":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/#primaryimage","url":"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/03\/Diseno-sin-titulo-2023-08-01T124601.771-1536x1024-1.png","contentUrl":"https:\/\/biorig.energy\/wp-content\/uploads\/2025\/03\/Diseno-sin-titulo-2023-08-01T124601.771-1536x1024-1.png","width":1536,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/biorig.energy\/biorig-invertira-250-millones-de-euros-para-construir-10-instalaciones-de-produccion-de-biometano-en-castilla-y-leon\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/biorig.energy\/en\/"},{"@type":"ListItem","position":2,"name":"Biorig will invest 250 million euros to build 10 biomethane production facilities in Castilla y Le\u00f3n."}]},{"@type":"WebSite","@id":"https:\/\/biorig.energy\/#website","url":"https:\/\/biorig.energy\/","name":"Biorig","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/biorig.energy\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/biorig.energy\/#\/schema\/person\/9e98c4e4ef4a7e6de3862e92a08214cc","name":"jesus","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/5caf1f24679fbfd198c93f845a85f7cd1c181cd3d6cc6f62e71af6f275f56bdc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/5caf1f24679fbfd198c93f845a85f7cd1c181cd3d6cc6f62e71af6f275f56bdc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5caf1f24679fbfd198c93f845a85f7cd1c181cd3d6cc6f62e71af6f275f56bdc?s=96&d=mm&r=g","caption":"jesus"},"sameAs":["https:\/\/biorig.energy"],"url":"https:\/\/biorig.energy\/en\/author\/jesus\/"}]}},"_links":{"self":[{"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/posts\/2809","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/comments?post=2809"}],"version-history":[{"count":1,"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/posts\/2809\/revisions"}],"predecessor-version":[{"id":2810,"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/posts\/2809\/revisions\/2810"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/media\/506"}],"wp:attachment":[{"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/media?parent=2809"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/categories?post=2809"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/biorig.energy\/en\/wp-json\/wp\/v2\/tags?post=2809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}